Oakland, California

This 20 foot deep excavation at the corner of 12th St and Broadway in Oakland, CA consisted of soldier beams with wood lagging, tiebacks, internal bracing, and underpinning. The 12th street BART station is only 4 feet beyond the site property line which presented unique challenges in our design of the excavation support system along Broadway.