San Francisco, California

Building shoring for this project consisted of lateral and vertical support of the historic exterior wall of the African Hall. Our shoring design was optimized to avoid new building construction and to limit penetrations through the granite wall for shoring connections to a maximum of 1 inch diameter holes.