San Francisco, California

The 555 Mission project included soil-cement mix “cut-off” shoring and slant-drill underpinning with jet-grout cut-off. The excavation depth was approximately 30-feet. Our design constraints included the presence of Bay Mud soil, high groundwater, limited tieback length at narrow streets, and movement-sensitive adjacent buildings.